Hello,
We had a contractor who upgraded our internet sales for ERP application with custom developments from ISA 7.0 to 7.32 SP 4. He created a track on our NWDI 7.3 system and resolved integration conflicts, merged our code with SAP code etc. Now that he left, we have our dev workspace and cons workspace out of sync. Which means our dev workspace has different number of DCs than our cons workspace(SC: SAP-SHRWEB). I also see there are broken DCs on the cons workspace. I am not able to perform an assembly on the cons workspace because of broken DCs. We know that the Dev workspace is perfect and working. How do we integrate or replicate the Dcs from Dev to cons workspace? Is there a way to sync up the DCs in both the workspaces?
Any help is much appreciated.
Thanks
MLS