Hi,
Currently, we have 7.2 development landscape that includes CE 7.2
connected to NWDI 7.2.
At the same time we have another system with new NWDI 7.31 configured and
we would like to understand how can we "merge" the current 7.2 system into 7.31 system
so we will have one NWDI in the organization.
Is it possible ? how exactly ? can we "Upgrade" 7.2 SCs to 7.31 during the merge ?
Kind regards,
Dimitry