Hello
W'ere in a process of moving from CMS to CM Services.
In CMS we have two tracks configured with the same transport path, so that we can perform both bug fixes and enhancements at the same time without having to apply enhancements onto bug fixes. This allowed creating two different workspaces in DTR and build spaces in CBS.
Given that CM services does not have the track concept anymore I was wondering whether this scenario is still possible under CM services and if yes then what would be the best way to achieve it?
Thanks
Roy